This week we completed our plans to solve the problem of the eroded path by the Lilja School Trail. We took our teams down to the site earlier in the week with measuring tools, iPads and clipboards in hand to do a final assessment of what our plan recommendations would be.  Then kids worked with their House Table teams to brainstorm ideas and collaborate on a final plan to present.

Most teams' plans started with addressing the existing drainage pipe underneath the path meant to cope with snow melt run-off and rain that streams down the hill.  All teams identified a problem with the pipe determining it is either clogged or broken, and made recommendations to clean it out, add a strainer cap, and repair any damage to make that pipe more efficacious.

Another common step in most plans was to replace the gravel, rocks and soil that had been washed away. Some teams thought it was advisable to put the granite barrier back in place to shore up the mix of gravel and soil. Thinking ahead to maintaining the repaired path and preventing (or slowing) future erosion, teams included the additional step of planting grass so that the roots can help hold the new soil in place.

Pictures of their plans are included below. We were impressed with each team's collaborative approach to problem-solving and their methodical approach to solving this real-world issue. Our next step is send these plans to our DPW team for review. We are excited to get together with them and fix the path together!



















 








No comments:

Post a Comment